Top Quality Forged & Machined Parts - Tube Bending – Donghao Metal Group

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Quality comes first; service is foremost; business is cooperation" is our business philosophy which is constantly observed and pursued by our company for Astm A312 Tp321 Seamless Pipe , Monel 400 Tube , Super Duplex Stainless Steel , We believe this sets us apart from the competition and makes customers choose and trust us. We all wish to create win-win deals with our customers, so give us a call today and make a new friend!
Top Quality Forged & Machined Parts - Tube Bending – Donghao Metal Group Detail:

We can supply high quality bend tubes according to customer’s drawings and requirements. We have advanced machines for bending, stress relieve heat treatment, hydrostatic test machine etc, the smallest radius can be 0.5D, our bend tubes are widely used in pressure vessel and boiler plants.

U-BENDING / U bend Tubing / U Tube:

U-BENDING / U bend Tubing / U Tube heat exchangers comprise a U shaped tube fixed by flow baffles or tubes supports and placed in shell to control the fluid present in the exterior of the tube assembly. The fluid is guided into the tubes by a head assembly, which is fixed to the shell by bolts.

Bending Radius: From 1.5 * O.D (outside diameter) ,When ordering tubes with bending radius less than 1.5*OD, it is necessary to get the agreement with us.

Straight tubes maximum length (before bending): 35000 mm.

Leg length: min 1 meter, max. 16500 mm (for max r=1500mm) 

Note: Other sizes are available upon agreement.

Heat treatment: stress relieved after u-bending (bending area plus 300mm for each leg).

Standards: A213/A269, A789/A790, EN 10216-5 TC1, ASME SA – 556/556 m

Outside diameter range from 6.35-50.8mm

Wall thickness range from 0.71-3.81mm

Inspection & Test:

1. 100% PMI / Chemical analysis tests.

2.100% Dimension tests & 100% Visual examination

3. Tension test, flange test, hardness test, flattening test

4. 100% Eddy Test or Hydrostatic Test before bending and 100% Hydrostatic test after bending

5. Checking stress released heat treatment in bending area plus 300mm straight leg length after bending with agreement with clients.

Notes: all the tests and inspection need to provide with reports according to standard and test results.


Product detail pictures:

Top Quality Forged & Machined Parts -
 Tube Bending – Donghao Metal Group detail pictures

Top Quality Forged & Machined Parts -
 Tube Bending – Donghao Metal Group detail pictures

Top Quality Forged & Machined Parts -
 Tube Bending – Donghao Metal Group detail pictures


Related Product Guide:

Being supported by an innovative and experienced IT team, we could present technical support on pre-sales & after-sales service for Top Quality Forged & Machined Parts - Tube Bending – Donghao Metal Group, The product will supply to all over the world, such as: Oman , British , Detroit , For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
  • It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Rebecca from Karachi - 2015.05.15 10:52
    Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Phyllis from Sevilla - 2016.03.28 16:34
    
    WhatsApp Online Chat !