Short Lead Time for Aisi 312 Stainless Pipe/Tube - High pressure seamless bolier tubes – Donghao Metal Group Detail:
Seamless Boiler Tubes in an extensive range of stainless steel and alloy steel, suitable for boilers, such as high pressure boilers, steam HRSG boilers, high pressure feed water heaters, super heaters.
DMG’s seamless boiler tube program includes High pressure boiler tubes and Super length boiler tubes, our boiler tubes are supplied in straight lengths up to 28 meters, or as U-bent tubes.
Main Material:
T1, T2 , T11 , T12 , T22 , T23 , T91 , T92
Other grades can be offered on request.
Standards: ASME SA213M EN 10216-2
Outside diameter range from 6.35-50.8mm
Wall thickness range from 0.71-3.81mm
Inspection & Test:
1. 100% PMI / Chemical analysis tests.
2.100% Dimension tests & 100% Visual examination
3. Tension test, flange test, hardness test, flattening test
4. 100% Eddy Test or Hydrostatic Test before bending and 100% Hydrostatic test after bending
5. Checking stress released heat treatment in bending area plus 300mm straight leg length after bending with agreement with clients.
Notes: all the tests and inspection need to provide with reports according to standard and test results.
U-BENDING / U bend Tubing / U Tube:
U-BENDING / U bend Tubing
Bending Radius: From 1.5 * O.D (outside diameter) ,When ordering tubes with bending radius less than 1.5*OD, it is necessary to get the agreement with us.
Straight tubes maximum length (before bending): 35000 mm.
Leg length: min 1 meter, max. 16500 mm (for max r=1500mm)
Note: Other sizes are available upon agreement.
Heat treatment: stress relieved after u-bending (bending area plus 300mm for each leg).
Product detail pictures:

Related Product Guide:
We have been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for Short Lead Time for Aisi 312 Stainless Pipe/Tube - High pressure seamless bolier tubes – Donghao Metal Group, The product will supply to all over the world, such as: Czech republic , kazan , Israel , Our company sets up several departments, including production department, sales department, quality control department and sevice center,etc. only for accomplish the good-quality product to meet customer's demand, all of our products have been strictly inspected before shipment. We always think about the question on the side of the customers,because you win,we win!
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
-
Manufacturer of304l Stainless Steel Pipe - Tub...
-
Short Lead Time for High Pressure Boiler Tube -...
-
Factory source Aisi Stainless Steel Pipe - Hig...
-
Special Design for 304/316l Tubing - Finned tu...
-
Rapid Delivery for Stainless Steel Coiled Tube ...
-
Europe style for High Pressure Bolier Tubes - ...